Diamond Materials recently completed work at Route 38 and Lawrence Blvd, New Jersey. 35-acres of land is now home to a new 478,715 square foot warehouse with 127 trailer stalls and distribution facility.
Work Performed:
Topsoil stripped: 26340 CY Cuts to fills: 70,300 CY Storm sewer: 2605 LF Sanitary sewer: 9050 LF Waterline: 6713 LF Sidewalk: 7000 SF Curb: 23,500 LF Paving: 15205 tons 9β Thick Loading dock and Dolly Pads 120,795 SF Excavate and install three Bio-retention ponds Installation of a 2580 SF retaining wall, 26 catch basins and 1 wet tap